Studies & Analysis

Feasibility Studies
Several feasibility studies have been completed for the Mountain Division Line

Engineering Studies
Engineering studies are the final stage before construction of the trail

Trail Counts
Trail counts have been conducted to assist with analyzing trail patterns and usage
Engineering Studies
Windham to Westbrook Section
–2024 Preliminary Design Report
Fryeburg, Brownfield, Hiram Section
–2026 Virtual Public Hearing w/ draft documents
–2026 MaineDOT Bid Link w/ full trail document
Trail Counts
–2023 Trail Counts
–2024 Trail Counts
–2025 Trail Counts
–2026 Trail Counts
